Approximately 1950 panels were used in the BUSELİK 5 SPP ELAZIĞ 2 SPP, which we implemented in the Elazığ - Merkez region in 2018, with a power of 0.78 MW. With an electricity production of approximately 1144348 kWh, the power plant meets the electricity consumption equivalent to the annual average coal consumption of 462 tons. A Solar Power Plant with this production capacity prevents approximately 1140 tons of CO2 emissions annually and corresponds to approximately 61794 trees annually. The BUSELİK 5 SPP ELAZIĞ 2 SPP contributes to the reduction of our dependence on foreign energy and makes an important contribution to nature.
Company Name
BUSELİK 2 GÜNEŞ ENERJİSİ LTD. ŞTİ.
Type of Project
Ground Mounted SPP
Power of Project
0.78 MW
Location of the Project
Elazığ/Merkez
Situation of the Project
Completed