Approximately 3000 panels were used in the ACEKA NİSAN SPP ELAZIĞ 3 SPP, which we implemented in the Elazığ - Merkez region in 2018, with a power of 1.2 MW. With an electricity production of approximately 1760536 kWh, the power plant meets the electricity consumption equivalent to the annual average coal consumption of 711 tons. A Solar Power Plant with this production capacity prevents approximately 1755 tons of CO2 emissions annually and corresponds to approximately 95068 trees annually. The ACEKA NİSAN SPP ELAZIĞ 3 SPP contributes to the reduction of our dependence on foreign energy and makes an important contribution to nature.
Company Name
ACEKA 3 GÜNEŞ ENERJİSİ A.Ş.
Type of Project
Ground Mounted SPP
Power of Project
1.2 MW
Location of the Project
Elazığ/Merkez
Situation of the Project
Completed
The project is an investment of Masfen Energy.